Hi everyone,
About time for an update! We had another meeting with the architect on December 22nd. Over the last few months he has been working with the engineer, drawing up structural, plumbing and electrical plans, and made a few minor changes to the floor plan to account for these. We also went through the glazing schedule, confirming the sizes and types of all the windows. We also met the builder for the first time!
Latest plan revisions:
There were another 20 or so diagrams/plans with these ones but I won't upload them all - things like updated elevation diagrams, subfloor plan, roof plan, and so on, I won't scan them all :)
Major changes:
- A niche running all the way around the top cornice area of 3 sides of the house - this was because the roof support structure needed a bit more space than what was available (and raising the roof level would have required going back to planning approval) so to keep window sizes the standard height they added a gap. This works out well because it provides a spot where blinds etc. can be installed and then be hidden when they are open - and also allows some niches to be built into some walls.
- Laundry chute location confirmed, after about 4 different options were attempted!
- AV/network cabinet location changed - made it bigger and placed it between the theatre and the garage. Discussions with many AV enthusiasts have let me to believe that cat5/6 will be used for AV in the future (there are adaptors to do so now) so as a result it made sense to consolidate the network and AV runs.
- A step before entering the garage - because the garage is 300mm higher than the rest of the lower floor. I think the step may get in the way a bit, so will raise some alternatives with the architect!
We've also confirmed some floor surfaces:
- Polished concrete in the downstairs hallway (as well as hopefully a polished concrete benchtop)
- Modwood for the decks - modwood is made of sawdust and recycled plastic milk bottles, doesn't require oiling every year or other maintenace, and doesn't splinter!
I've also done some sketchup mockups of some areas to give the architect and builder an idea of what we are after.
Kitchen:
(Appliances are Electrolux oven & induction cooktop, F&P fridge, Robinhood rangehood and Asko dishwasher)
Laundry:
And my work of art, the AV unit!
Construction is now expected to start in March 2011.. which means we may not be in there before Christmas 2011 as we had hoped, but that's ok, we'd rather it be done well than done quick!
That'll do for now, electrical and plumbing to come in a future update!
Before and after - Part 1
9/20/2010
Posted by Chuq
As I alluded to in a previous house update, here are some "before and after" plans of some parts of our new house, compared to similar areas in our current place.
This is one of the areas to gain the most in the new house. One of the hardest parts about doing the map above was working out what room was what in our current house to make the comparison!
At the moment the dining room is the first room that people walk into when they come in the front door, which is not ideal considering how much mess babies and toddlers make when eating! It also means part of the room is basically a hallway which only makes it smaller. The new dining room is twice as big and also features a length of daybed storage (similar to the master bedroom).
House update - models and pictures!
8/06/2010
Posted by Chuq
It's been a long time since the last update, but plenty has been happening! I just haven't kept the blog updated... here is a roundup of the last few months ... and this post will be light on text, high on pictures!
At our May architect meeting, we saw a cardboard model of the house!
It is long lasting and very low maintenance - basically needs cleaning once every ten years - which is great for people who are, lets say, home maintenance challenged such as ourselves!
Our plans are currently with the Hobart City Council and were advertised publicly on July 21st!
The public review period has ended and I don't know if the council received any submissions, but we did receive one call from a neighbour - saying that if we had any clean fill to get rid of, we are more than welcome to have it dumped on his block!
Last of all, I have been playing with Google Sketchup (which incidentally runs quite well under WINE) to design some of the joinery areas. The most complete one so far is the kitchen:
Popular Posts
-
The Tasmania United FC taskforce has announced the result of the public sentiment survey which was carried out over January. 1000 Tasmani...
-
This may end up being a bit of a rant, for that I am terribly sorry.... but where better to get it out than here ;) Firstly I would like to ...
-
The first floor framing started just before Christmas! ... and as before, it went up rather quickly.. The relatively steep slope m...
-
Hi everyone, About time for an update! We had another meeting with the architect on December 22nd. Over the last few months he has been wor...